CN EN JP

Wind power transportation

Release date:2023-07-21

We have the ability to transport a large wind turbine generator to any region in the world with demand. Due to the overweight and oversized equipment, special logistics solutions are required for transportation. We choose a combination of sea and land transportation. First, the generator is disassembled into several separable components for easier handling during transportation. Then, these components are packed and transported by truck to the port for safe loading, and transported by ocean shipping to the destination. Finally, the goods are unloaded and transported to the final destination of the wind farm. During the process, special transportation equipment such as cranes and ultra-low flatbed trucks are used to ensure the smooth arrival of goods at the wind farm.
The transportation of wind power generation equipment is extremely complex and special. Through reasonable organization and coordination, we have assisted manufacturers in successfully transporting wind power generation equipment safely to overseas destinations, thus promoting the development of the local wind power industry.